Engineering change orders and engineering drawings of the rim, handle, swing arm, frame, seat, sprocket, ring, shock absorber, dial assembly, rear fender, collar, damper, washer and rivet for the all-terrain vehicle
Engineering changes and power safety
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0001887010 / 1986-08-12
Date of Publication:
June 1, 1986
Date of Creation:
1986
Title:
Engineering changes and power safety : student guide.
Edition:
Prelim. ed.
Series:
IBM National Service Division service education
Description:
36 p.
Variant title:
Engineering changes and power safety : student guide.
Other Title:
I B M National Service Division service education
Copyright Claimant:
International Business Machines Corporation, a.a.d.: I B M Corporation
Names:
International Business Machines Corporation (34378 documents)
example document: IBM system/34 single-program mode lumber dealers management accounting system (L D M A S) sales analysis runbook
example document: IBM system/34 single-program mode lumber dealers management accounting system (L D M A S) sales analysis runbook
|
|
Engineering change announcements and diagnostic tips
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0002907045 / 1990-09-10
Date of Publication:
June 28, 1990
Date of Creation:
1990
Title:
Engineering change announcements and diagnostic tips.
Series:
IBM personal system/2
Copyright Claimant:
International Business Machines Corporation, a.a.d.: IBM Corporation
Names:
International Business Machines Corporation (34378 documents)
example document: IBM system/370 model 168 theory of operation/diagrams manual
example document: IBM system/370 model 168 theory of operation/diagrams manual
Engineering change notice
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0004024576 / 1995-05-03
Date of Publication:
June 1, 1994
Date of Creation:
1994
Title:
Engineering change notice.
Application Title:
Deltek engineering change notice/material management : version 4.1.
Edition:
Rev.
Basis of Claim:
New Matter: revisions, updating, rewriting.
Previous Registration:
Version 4.0D prev. reg. 1994, TX 3-928-149.
Description:
1 v.
Other Title:
Deltek engineering change notice/material management
Engineering change notice/material management
Engineering change notice/material management
Copyright Claimant:
Deltek Systems, Inc.
Notes:
Operating manual.
Names:
Deltek Systems, Inc. (88 documents)
example document: Accounts payable
example document: Accounts payable
|
|
Engineering change orders and engineering drawings, front fork
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000396009 / 1989-12-28
Date of Creation:
1985
Title:
Engineering change orders and engineering drawings, front fork.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
|
|
Engineering change orders for all-terrain vehicles
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000412002 / 1990-05-09
Date of Creation:
1985
Title:
Engineering change orders for all-terrain vehicles : product codes LT100A-A203, LT110-A203, LT200A-203 ... [et al.]
Language:
Japanese & English.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders, engineering design drawings, and R & D test reports, test standards, and design standards
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000428525 / 1990-07-18
Date of Creation:
1988
Title:
Engineering change orders, engineering design drawings, and R & D test reports, test standards, and design standards.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change order transmittal, documents and specifications for the JS440-A1A and JS440-A2 model jet ski vehicles
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000433648 / 1990-10-19
Date of Creation:
1978
Title:
Engineering change order transmittal, documents and specifications for the JS440-A1A and JS440-A2 model jet ski vehicles.
Description:
1 v. + sheets.
Variant title:
Engineering change order transmittal, documents and specifications for the JS440-A1A and JS440-A2 model jet ski
Copyright Claimant:
Kawasaki Motors Manufacturing Corporation, USA
Authorship on Application:
Kawasaki Motors Corporation, USA, employer for hire.
Names:
Kawasaki Motors Manufacturing Corporation, USA
Kawasaki Motors Corporation, USA
|
|
Kawasaki Motors Corporation, USA
Engineering change orders for the JS440-A1A and JS440-A2 model jet ski vehicles
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000433649 / 1990-10-19
Date of Creation:
1978
Title:
Engineering change orders for the JS440-A1A and JS440-A2 model jet ski vehicles.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Description:
1 v. + sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawing for the carburetor assembly of the 1988 model KX500-D1 motorcycle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000491631 / 1991-10-15
Date of Creation:
1990
Title:
Engineering change orders and engineering drawing for the carburetor assembly of the 1988 model KX500-D1 motorcycle.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd. (82 documents)
example document: Translation of various specification test results and marketability evaluation for the JH750A model jet ski
example document: Translation of various specification test results and marketability evaluation for the JH750A model jet ski
Engineering change orders and engineering drawings for the model KXF250-A1
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000491632 / 1991-10-15
Date of Creation:
1988
Title:
Engineering change orders and engineering drawings for the model KXF250-A1.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders for the KLF110-A, KLF110-B, KLF185-A ... [et al.]
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000533408 / 1992-08-19
Date of Creation:
1986
Title:
Engineering change orders for the KLF110-A, KLF110-B, KLF185-A ... [et al.]
Copyright Claimant:
Kawasaki Heavy Industries
Names:
Kawasaki Heavy Industries
Engineering change orders, engineering drawings of nuts, sidestands and frames and test reports of endurance, strength and retractability
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000557286 / 1993-02-24
Date of Creation:
1981
Title:
Engineering change orders, engineering drawings of nuts, sidestands and frames and test reports of endurance, strength and retractability.
Language:
English translation.
Copyright Note:
C.O. correspondence.
Description:
Sheets.
Variant title:
Engineering change orders, engineering drawings of nuts, sidestands and frames
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Notes:
Text.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings for the KLF185-A all-terrain vehicle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000562901 / 1993-04-27
Date of Creation:
1990
Title:
Engineering change orders and engineering drawings for the KLF185-A all-terrain vehicle.
Copyright Note:
C.O. correspondence.
Description:
Sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Authorship on Application:
compilation of terms, Japanese & English text, diagrams and drawings: Kawasaki Heavy Industries, Ltd., employer for hire.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings of the rim, handle, swing arm, frame, seat, sprocket, ring, shock absorber, dial assembly, rear fender, collar, damper, washer and rivet for the all-terrain vehicle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000593532 / 1994-10-06
Date of Creation:
1985
Title:
Engineering change orders and engineering drawings of the rim, handle, swing arm, frame, seat, sprocket, ring, shock absorber, dial assembly, rear fender, collar, damper, washer and rivet for the all-terrain vehicle.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Variant title:
Engineering change orders and engineering drawings of the rim, handle, swing arm, frame, seat, sprocket
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders for the KZ550H-A201, motorcycle test standards and test reports for the 1985 VN700-A1 model
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000593535 / 1994-10-06
Date of Creation:
1988
Title:
Engineering change orders for the KZ550H-A201, motorcycle test standards and test reports for the 1985 VN700-A1 model.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders of the model FJ650 fuel system, engineering drawings of the fuel and electric system and the 1990 KX125H complete inspection standard
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000677233 / 1995-04-19
Date of Creation:
1993
Title:
Engineering change orders of the model FJ650 fuel system, engineering drawings of the fuel and electric system and the 1990 KX125H complete inspection standard.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Variant title:
Engineering change orders of the model FJ650 fuel system, engineering drawings of the fuel and electric system
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings of the JF650 model Jet Ski
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000682788 / 1997-12-12
Date of Creation:
1994
Title:
Engineering change orders and engineering drawings of the JF650 model Jet Ski.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings for the ZX600-A model motorcycle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000685734 / 1995-04-19
Date of Creation:
1988
Title:
Engineering change orders and engineering drawings for the ZX600-A model motorcycle.
Description:
2 p. + sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings for the KLF300-C2 all-terrain vehicle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000695816 / 1995-11-28
Date of Creation:
1994
Title:
Engineering change orders and engineering drawings for the KLF300-C2 all-terrain vehicle.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change order, engineering drawings, test report and specification of plastic for the ZX750 motorcycle
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000715510 / 1996-08-14
Date of Creation:
1988
Title:
Engineering change order, engineering drawings, test report and specification of plastic for the ZX750 motorcycle.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
on Japanese text, English translation, compilation of terms, diagrams & drawings; Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings regarding the hull and pump cover
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000753721 / 1996-05-14
Date of Creation:
1992
Title:
Engineering change orders and engineering drawings regarding the hull and pump cover.
Copyright Note:
C.O. correspondence.
Description:
Sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Notes:
Secured material.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders and engineering drawings for the KAF620-A1 Mule 2510 utility vehicle
Type of Work:
Art work
Registration Number / Date:
TXu000885172 / 1999-05-26
Date of Creation:
1998
Title:
Engineering change orders and engineering drawings for the KAF620-A1 Mule 2510 utility vehicle.
Other Title:
KAF620-A1 Mule 2510 utility vehicle
Copyright Claimant:
on compilation of terms, diagrams & drawings; Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change orders, test standards and test reports of the ZX1100-D2 motorcycle
Type of Work:
Machine-readable work or computer program
Registration Number / Date:
TXu000894284 / 1999-08-03
Date of Creation:
1992
Title:
Engineering change orders, test standards and test reports of the ZX1100-D2 motorcycle.
Language:
English & Japanese text.
Description:
Computer program.
Copyright Claimant:
on compilation of terms, diagrams; Kawasaki Heavy Industries, Ltd.
Notes:
Printout only deposited.
Names:
Kawasaki Heavy Industries, Ltd. (82 documents)
example document: Quality control chart and final inspection standards
example document: Quality control chart and final inspection standards
Engineering change order of the deflector
Type of Work:
Non-dramatic literary work
Array
TXu000896762 / 1998-12-29
TXu000923007 / 1999-09-13
TXu000923007 / 1999-09-13
Date of Creation:
1997
Title:
Engineering change order of the deflector.
Copyright Note:
C.O. correspondence.
See also Engineering change order of the deflector; Reg. 13Sep99; TXu 923-007
See also Engineering change order of the deflector; Reg. 13Sep99; TXu 923-007
Description:
4 p.
Copyright Claimant:
on compilation of terms & diagram; Kawasaki Motors Manufacturing Corporation, USA
Names:
Kawasaki Motors Manufacturing Corporation, USA
Engineering change orders, test reports, test standards and engineering drawings for the ZX1100
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000896806 / 1999-09-07
Date of Creation:
1990
Title:
Engineering change orders, test reports, test standards and engineering drawings for the ZX1100.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Authorship on Application:
Japanese text, English translation & compilation: Kawasaki Heavy Industries, Ltd., employer for hire.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change order of the deflector. By Kawasaki Motors Manufacturing Corporation, USA
Type of Work:
Non-dramatic literary work
Array
TXu000923007 / 1999-09-13
TXu000896762 / 1998
TXu000896762 / 1998
Title:
Engineering change order of the deflector. By Kawasaki Motors Manufacturing Corporation, USA.
Supplement to Registration:
TXu 896-762, 1998
Variant title:
Engineering change order of the deflector.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd. (on original appl.: Kawasaki Motors Manufacturing Corporation, USA)
Authorship on Application:
Kawasaki Heavy Industries, Ltd. (on original appl.: Kawasaki Motors Manufacturing Corporation, USA)
Names:
Kawasaki Motors Manufacturing Corporation, USA
Kawasaki Heavy Industries, Ltd.
Kawasaki Heavy Industries, Ltd.
Engineering change orders, sleeve, bolt, axle and collar engineering drawings and KIS product standards for the bolt-socket and washer-plane-small for the ZX1100-D6 motorcycle
Type of Work:
Architectural model
Registration Number / Date:
TXu001097698 / 2003-06-10
Date of Creation:
2001
Title:
Engineering change orders, sleeve, bolt, axle and collar engineering drawings and KIS product standards for the bolt-socket and washer-plane-small for the ZX1100-D6 motorcycle.
Description:
Technical drawings + 2 p.
Variant title:
Engineering change orders, sleeve, bolt, axle and collar engineering drawings and KIS product standards for the bolt-soc
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd.
Engineering change
Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu001143048 / 2002-05-10
Date of Creation:
2002
Title:
Engineering change : African American inventors in light and motion, 1840-1940.
Basis of Claim:
New Matter: additions.
Copyright Note:
C.O. correspondence.
Description:
Sheets.
Variant title:
Engineering change : African American inventors in light and motion, 1840-1940.
Copyright Claimant:
Friends, the Foundation of the California African American Museum
Authorship on Application:
California African American Museum. Education Department, employer for hire.
Names:
Friends, the Foundation of the California African American Museum
California African American Museum. Education Department
California African American Museum. Education Department
This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible. Multiple persons can share the same name.
