Engineering drawings and engineering change orders related to the wheel front of the ZX1000-C1 and quality assurance sheet and product evaluation tests regarded to the ZX1000-C1





Engineering drawing problems

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0000096699 / 1978-08-02
Date of Publication:
June 8, 1978
Date of Creation:
1977
Title:
Engineering drawing problems : to accompany French and Vierck Engineering drawing and graphic technology, twelfth edition and Fundamentals of Engineering drawing and graphic technology, fourth edition / Charles J. Vierck, Richard I. Hang.
Basis of Claim:
New Matter: additions & revisions.
Previous Registration:
Prev. reg. 1972, A334795.
Imprint:
New York : McGraw-Hill, c1978.
Description:
1 v.
Number of similar titles:
18
Other Title:
Engineering drawing and graphic technology, twelfth edition
Fundamentals of engineering drawing and graphic technology, fourth edition
Copyright Claimant:
McGraw-Hill, Inc.
Names:
Richard I. Hang (2 documents)
example document: Engineering drawing problems. By Charles J. Vierck & Richard I. Hang
Charles J. Vierck (15 documents)
example document: Graphic science and design

Copyrights records by Vierck, Charles J.


McGraw-Hill, Inc. (9613 documents)
example document: Financial accounting study guide

Copyrights records by McGraw-Hill, Inc.



Engineering drawing and blueprint reading

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0000551551 / 1980-06-25
Date of Publication:
July 19, 1980
Date of Creation:
1980
Title:
Engineering drawing and blueprint reading / by R. Vogts.
Basis of Claim:
New Matter: rev. cover, chap. V-X & p. 214-222.
Previous Registration:
Prev. reg. 18Jan80, TXu 36-492.
Copyright Note:
C.O. correspondence.
Imprint:
[s.l. : s.n.], c1980.
Description:
222 p.
Number of similar titles:
2
Copyright Claimant:
Raymond Vogts
Names:
Raymond Vogts 1935-
R. Vogts

Engineering drawing and blueprint reading

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0000834366 / 1981-12-18
Date of Publication:
September 21, 1981
Date of Creation:
1980
Title:
Engineering drawing and blueprint reading / Raymond Vogts.
Basis of Claim:
New Matter: new cover, updating & revisions.
Previous Registration:
Prev. reg. 1980, TX 551-551 & TXu 36-492.
Imprint:
New York : Arco Pub., c1981.
Description:
260 p.
Number of similar titles:
2
Other Title:
Arco engineering drawing and blueprint reading
Copyright Claimant:
Arco Publishing, Inc.
Performer:
Cover ti.: Arco engineering drawing and blueprint reading.
Names:
Raymond Vogts (3 documents)
example document: Everything you need to know about real estate for singles, couples, families, investors
Arco Publishing, Inc. (184 documents)
example document: GRE, graduate record examination general (aptitude) test

Copyrights records by Arco Publishing, Inc.



Engineering drawing and graphic technology problems book to accompany French/Vierck/Foster, Engineering drawing and graphic technology

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0001766202 / 1986-02-25
Date of Publication:
January 17, 1986
Date of Creation:
1985
Title:
Engineering drawing and graphic technology problems book to accompany French/Vierck/Foster, Engineering drawing and graphic technology.
Edition:
13th ed.
Basis of Claim:
New Matter: "editorial revisions and new material."
Previous Registration:
Prev. reg. 1978.
Variant title:
Engineering drawing and graphic technology problems book to accompany French/Vierck/Foster, Engineering drawing
Other Title:
Engineering drawing and graphic technology
Copyright Claimant:
McGraw-Hill, Inc.
Notes:
Cataloged from appl.
Authorship on Application:
editorial revisions and new material: Hugh Rogers.
Names:
Hugh Rogers (3 documents)
example document: Instructor's manual for Graphic science problems book, by Hugh Rogers, to accompany French, Vierck, Foster, Graphic science and design, fourth edition

Copyrights records by Rogers, Hugh


Foster (5 documents)
example document: Understanding mathematics

Copyrights records by Foster


Vierck

Copyrights records by Vierck


French

Copyrights records by French


McGraw-Hill, Inc. (9613 documents)
example document: Tips and techniques for using low-cost and public domain software

Engineering drawing problems

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0002291167 / 1988-03-28
Date of Publication:
August 31, 1978
Date of Creation:
1978
Title:
Engineering drawing problems / W. D. Teter.
Description:
sheets in folder.
Number of similar titles:
18
Copyright Claimant:
W. David Teter as Labyrinth Enterprises
Names:
W. David Teter 1936-
Labyrinth Enterprises (8 documents)
example document: Labyrinth

Copyrights records by Labyrinth Enterprises



Engineering drawing and graphic technology

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0002319268 / 1988-05-09
Date of Publication:
February 29, 1988
Date of Creation:
1987
Title:
Engineering drawing and graphic technology : problems book II : to accompany French/Vierck/Foster Engineering drawing and graphic technology, thirteenth edition / Hugh Rogers.
Basis of Claim:
New Matter: "editorial revisions and new material."
Previous Registration:
Prev. reg. 1986, TX 1-766-202.
Description:
sheets.
Number of similar titles:
5
Variant title:
Engineering drawing and graphic technology : problems book II
Copyright Claimant:
McGraw-Hill, Inc.
Names:
Hugh Rogers (3 documents)
example document: Instructor's manual for Graphic science problems book, by Hugh Rogers, to accompany French, Vierck, Foster, Graphic science and design, fourth edition
Foster (5 documents)
example document: You're still laughing
Vierck
French
McGraw-Hill, Inc. (9613 documents)
example document: Encyclopedia of mystery and detection

Engineering drawing problems/CAD tutorials

Type of Work:
Machine-readable work or computer program
Registration Number / Date:
TX0002501604 / 1988-04-01
Date of Publication:
January 31, 1988
Date of Creation:
1988
Title:
Engineering drawing problems/CAD tutorials.
Copyright Note:
C.O. correspondence.
Description:
sheets + magnetic disk.
Copyright Claimant:
W. D. Teter
Authorship on Application:
W. D. Teter.
Names:
W. D. Teter 1936-
Labyrinth Enterprises (8 documents)
example document: As the world falls down. By David Bowie

Engineering drawing practices

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0004775728 / 1998-05-13
Date of Publication:
February 25, 1998
Date of Creation:
1998
Title:
Engineering drawing practices : ASME Y14.100M-1998.
Description:
16 p.
Number of similar titles:
2
Variant title:
Engineering drawing practices : ASME Y14.100M-1998.
Copyright Claimant:
American Society of Mechanical Engineers
Names:
American Society of Mechanical Engineers (3720 documents)
example document: Measurement of fluid flow by means of coriolis mass flowmeters

Copyrights records by American Society of Mechanical Engineers



Engineering drawing

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0005061855 / 1999-09-28
Date of Publication:
September 9, 1999
Date of Creation:
1999
Title:
Engineering drawing : problem series 3 / Paige Davis, Karen Renee Juneau.
Edition:
2nd ed.
Basis of Claim:
New Matter: updating & additions.
Previous Registration:
Prev. reg.
Imprint:
Upper Saddle River, NJ : Prentice Hall, c2000.
Description:
1 v.
Number of similar titles:
111
Variant title:
Engineering drawing : problem series 3
Copyright Claimant:
Prentice-Hall, Inc.
Names:
Karen Renee Juneau

Copyrights records by Juneau, Karen Renee


Paige Davis
Prentice-Hall, Inc. (10948 documents)
example document: La dinamica de la tierra

Copyrights records by Prentice-Hall, Inc.



Engineering drawing practices

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0005531685 / 2002-01-14
Date of Publication:
November 23, 2001
Date of Creation:
2001
Title:
Engineering drawing practices : an American national standard : ASME Y14.100-2000.
Edition:
Revision of ASME Y14.100M-1998.
Basis of Claim:
New Matter: new & rev. material.
Previous Registration:
Prev. reg. 1998, no. 4-775-728.
Description:
41 p.
Number of similar titles:
2
Copyright Claimant:
American Society of Mechanical Engineers
Names:
American Society of Mechanical Engineers (3720 documents)
example document: ASME International Conference on Advances in Life Prediction Methods

Engineering drawing

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0005645220 / 2002-11-26
Date of Publication:
September 18, 2002
Date of Creation:
2001
Title:
Engineering drawing : problem ser. 3 / Paige Davis, Karen Renee Juneau.
Edition:
3rd ed.
Basis of Claim:
New Matter: revisions & updating.
Previous Registration:
Prev. reg. 1999, TX 5-061-855. Appl. states authorship excludes CD-ROM.
Imprint:
Upper Saddle River, NJ : Prentice Hall, Pearson Education, c2003.
Description:
87 p. + CD-ROM.
Number of similar titles:
111
Variant title:
Engineering drawing : problem ser. 3
Copyright Claimant:
Pearson Education, Inc.
Names:
Karen Renee Juneau
Paige Davis
Pearson Education, Inc. (6087 documents)
example document: Relational discipline

Copyrights records by Pearson Education, Inc.



Engineering drawing practices

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TX0006244871 / 2005-09-20
Date of Publication:
September 6, 2005
Date of Creation:
2005
Title:
Engineering drawing practices : ASME Y14.100-2004.
Application Title:
Engineering drawing practices : ASME Y14.100-2000.
Basis of Claim:
New Matter: additions & revisions.
Previous Registration:
Prev. reg. 2002, TX 5-531-685.
Copyright Note:
Cataloged from appl. only.
Number of similar titles:
2
Copyright Claimant:
American Society of Mechanical Engineers
Names:
American Society of Mechanical Engineers (3720 documents)
example document: Analysis and design of energy systems

Engineering drawing and blueprint reading

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000036492 / 1980-01-18
Date of Creation:
1980
Title:
Engineering drawing and blueprint reading / R. Vogts.
Description:
186 p.
Number of similar titles:
2
Copyright Claimant:
Raymond Vogts
Names:
Raymond Vogts 1935-
R. Vogts

Engineering drawings, test reports, assembly standards and specification lists regarding the KZ550 motorcycle

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000396012 / 1989-12-28
Date of Creation:
1982
Title:
Engineering drawings, test reports, assembly standards and specification lists regarding the KZ550 motorcycle.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.
Names:
Kawasaki Heavy Industries, Ltd. (48 documents)
example document: Test report for main specifications measuring, frame comp, bar comp and seat belt engineering drawings and engineering change orders from the KAF620-C1-mule

Copyrights records by Kawasaki Heavy Industries, Ltd.



Engineering drawings and R & D test reports on models ZX900-A1, ZX600-A1 and ZX900-A2, test standards and engineering change orders

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000396016 / 1989-12-28
Date of Creation:
1985
Title:
Engineering drawings and R & D test reports on models ZX900-A1, ZX600-A1 and ZX900-A2, test standards and engineering change orders : Japanese and English.
Copyright Note:
C.O. correspondence.
Description:
2 v.
Variant title:
Engineering drawings and R & D test reports on models ZX900-A1, ZX600-A1 and ZX900-A2, test standards
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of fuel tank cap, fuel tank and fuel tap assembly

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000396021 / 1989-12-28
Date of Creation:
1986
Title:
Engineering drawings of fuel tank cap, fuel tank and fuel tap assembly.
Language:
Japanese.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of side stand, bracket stand, main stand, frame-comp, spring, self-locking nut and bolt

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000407005 / 1990-04-18
Date of Creation:
1984
Title:
Engineering drawings of side stand, bracket stand, main stand, frame-comp, spring, self-locking nut and bolt.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of transmission parts for the 1978 KZ1000-D1

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000407006 / 1990-04-18
Date of Creation:
1981
Title:
Engineering drawings of transmission parts for the 1978 KZ1000-D1.
Language:
Japanese & English.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of manual labels, specification labels, and certification labels

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000428528 / 1990-07-18
Date of Creation:
1987
Title:
Engineering drawings of manual labels, specification labels, and certification labels.
Language:
Japanese.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of speed meter cable and brake hose

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000438602 / 1990-10-10
Date of Creation:
1986
Title:
Engineering drawings of speed meter cable and brake hose.
Copyright Note:
C.O. correspondence.
Description:
sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of jet ski hull and pump cover

Type of Work:
Art work
Registration Number / Date:
TXu000461657 / 1991-02-01
Date of Creation:
1973
Title:
Engineering drawings of jet ski hull and pump cover.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of the KXT250 all-terrain vehicle

Type of Work:
Art work
Registration Number / Date:
TXu000506003 / 1992-02-21
Date of Creation:
1986
Title:
Engineering drawings of the KXT250 all-terrain vehicle.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings of model KX250B

Type of Work:
Art work
Registration Number / Date:
TXu000521417 / 1992-01-28
Date of Creation:
1981
Title:
Engineering drawings of model KX250B.
Basis of Claim:
New Matter: additions, compilation.
Copyright Note:
C.O. correspondence.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawing for the 1987 model ZX600-A3 motorcycle

Type of Work:
Art work
Registration Number / Date:
TXu000571754 / 1993-08-18
Date of Creation:
1987
Title:
Engineering drawing for the 1987 model ZX600-A3 motorcycle.
Copyright Note:
C.O. correspondence.
Description:
3 p.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings for old and new interlock devices

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000582464 / 1993-08-18
Date of Creation:
1984
Title:
Engineering drawings for old and new interlock devices.
Copyright Note:
C.O. correspondence.
Description:
Sheets.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings and engineering change orders for the DX200E-A201

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000582467 / 1993-08-18
Date of Creation:
1988
Title:
Engineering drawings and engineering change orders for the DX200E-A201.
Copyright Note:
C.O. correspondence.
Description:
2 v.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

Engineering drawings for the ZX600-B1 motorcycle

Type of Work:
Art work
Registration Number / Date:
TXu000587759 / 1993-10-01
Date of Creation:
1987
Title:
Engineering drawings for the ZX600-B1 motorcycle.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
on drawings, compilation of terms and Japanese text; Kawasaki Heavy Industries, Ltd.
Notes:
Mechanical drawings.

Engineering drawings for the 1977 KD175-A2 and the 1980 KDX175-A1 brake pedal

Type of Work:
Art work
Registration Number / Date:
TXu000587760 / 1993-10-01
Date of Creation:
1980
Title:
Engineering drawings for the 1977 KD175-A2 and the 1980 KDX175-A1 brake pedal.
Copyright Note:
C.O. correspondence.
Description:
1 v.
Copyright Claimant:
on drawings, compilation of terms; Kawasaki Heavy Industries, Ltd.
Notes:
Mechanical drawings.

Engineering drawings of the ZX-11 motorcycle cable throttle

Type of Work:
Non-dramatic literary work
Registration Number / Date:
TXu000595924 / 1993-12-02
Date of Creation:
1989
Title:
Engineering drawings of the ZX-11 motorcycle cable throttle.
Description:
3 p.
Copyright Claimant:
on compilation of terms and drawings; Kawasaki Heavy Industries, Ltd.

Engineering drawings of the LF220A, 129A, LF300C and SF250A model vehicles

Type of Work:
Machine-readable work or computer program
Registration Number / Date:
TXu000617468 / 1995-02-06
Date of Creation:
1991
Title:
Engineering drawings of the LF220A, 129A, LF300C and SF250A model vehicles.
Description:
Machine-readable work.
Copyright Claimant:
Kawasaki Heavy Industries, Ltd.

This website is not affiliated with document authors or copyright owners. This page is provided for informational purposes only. Unintentional errors are possible. Multiple persons can share the same name.